Engineering Plans Development
Engineering Plans Development
Service Requirements
Requirements for the Engineering Drawings Preparation Service
1. Client Requirements (Documents & Information Needed)
-
Property deed or proof of ownership.
-
Recent site survey plan with official coordinates.
-
Municipality/authority requirements (if applicable).
-
Site photos (if available).
-
Project type specification (Residential – Commercial – Administrative – Industrial – Warehouses…).
-
Required spaces and functional needs (number of rooms, units, services, setbacks…).
-
Any special design preferences requested by the client.
-
Contact details of the person responsible for approvals and revisions.
2. Requirements Handled by Mosbeh Assaf Engineering Office
-
Review all provided documents and verify compliance.
-
Architectural design preparation in accordance with:
-
Saudi Building Code (SBC)
-
Municipality requirements
-
Civil Defense requirements when applicable
-
-
Structural drawings preparation according to approved codes (SBC – ACI – AISC).
-
MEP drawings preparation, including:
-
HVAC
-
Plumbing
-
Drainage systems
-
-
Electrical drawings preparation, including:
-
Power layouts
-
Lighting layouts
-
Electrical panels
-
-
Cross-discipline coordination to eliminate conflicts between drawings.
-
Issuing final stamped drawings ready for submission to authorities.
-
Providing technical support until approvals are completed.
3. Deliverables to the Client
-
Complete PDF package of all drawings.
-
Editable DWG files.
-
Printable copies (A0/A1) upon request.
-
Compliance report with Saudi Building Code.
-
Technical support during municipality or civil defense review.